Whether it's a single piece of furniture or the rebirth of a space, U.G. walks every step with you through the same rigorous, transparent process.
Custom Furniture & Soft Furnishing
One piece, from concept to your home
01
Consultation
~1 meeting
We learn how you live, your spatial needs, and your aesthetic direction.
02
Measurement & Proposal
~3–5 days
On-site measurement, followed by a furniture layout and material proposal.
03
Quote & Commission
~3–5 days
Pieces, materials and lead time confirmed; commission signed and deposit placed.
04
Sampling & Finalization
Varies by piece
Fabric, hardware, finish and every detail confirmed until it's exactly right.
05
Production & Quality Check
~25–50 days
Into production, inspected piece by piece before it ever leaves the workshop.
06
Delivery & Installation
~1–3 days
Delivered to your door and placed exactly where it belongs.
07
Handover & Warranty
Same-day · 1-year warranty+
Final walkthrough, sign-off, and warranty terms explained.
Interior Renovation
One space, from drawings to delivery
01
Consultation
Free · ~1 meeting
We learn how you live, your needs and budget, and sketch an initial direction.
02
Site Survey & Assessment
~1–3 days
Professional measurement and structural check — leaks, cracks, load-bearing walls.
03
Design Proposal & Quote
~7–14 days
A spatial layout and style direction, quoted for the design phase.
04
Design Agreement
~1–3 days
Scope, fee and payment terms confirmed — detailed design begins.
05
Detailed Design
~60–180 days
Renderings, materials, MEP layout, and full construction drawings.
06
Construction Quote & Agreement
~5–10 days
A full construction quote based on the finalized design, then contract.
07
Contractor Assignment & Site Prep
~7–10 days
Crew and materials scheduled; permits and paperwork handled.
08
Construction
~60–180 days (site-dependent)
Demolition, electrical & plumbing, masonry, carpentry, paint, HVAC, flooring, built-ins, lighting & curtains, furnishing — in sequence.
09
Handover & Warranty
Walkthrough ~1–2 days · 1–2 year warranty
Full inspection and handover, with warranty terms — free repairs for non-user damage.
Actual process and timeline vary by project; the signed contract governs.